Article
Long term diurnal variations in contaminant removal in high rate ponds treating urban wastewater.
Bioresource technology - 1 Sept 2006
García J, Green B F, Lundquist T, Mujeriego R, Hernández-Mariné M, Oswald W J
Abstract excerpt
In this investigation, diurnal variations in contaminant removal in high rate ponds (HRP) treating urban wastewater were evaluated. Two experimental HRPs (surface area 1.54 m2 and depth 0.3 m), each with a clarifier in series (surface area 0.025 m2), were operated in parallel with different hydraulic retention times (3-10 days) but with the same environmental conditions over a period of one year. The operating...
Read the complete abstract on PubMedTopics
Share this publication in a Topic to start or enrich a Post.
